London to Cambridgeshire

Closed 5 Aug 2021

Opened 11 Jun 2021

Why your views matter

Why we consulted
The consultation, which ended on 5th August, was designed to help the rail industry understand your views on the proposed new timetable. The results are currently being reviewed.

You can still read the full consultation document here that includes an overview as well as the proposed changes by station. Read the full proposed new timetable here.